
Assessments & CFD Modeling


CEG’s Assessments, CFD Provide the Right Roadmap for Optimization
CEG’s assessments and CFD Modeling capabilities clearly define facility infrastructure and operational issues in your data center, leading to real solutions related to power and cooling capacity, operational reliability, or energy usage. Once we’ve provided you with a roadmap for facility optimization, you can trust that our installation expertise ensures remediation is done right the first time.

Simulate Data Center Cooling and Airflow with CFD Modeling

Whether you’re designing a new data center, expanding an existing site, or looking to optimize your cooling and airflow for increased capacity or energy efficiency, we recommend you start the planning process off with a CFD study.
Details about room dimensions, equipment, heat loads, cooling systems, etc. are used to create a virtual representation ( baseline model) of your computing environment. The CFD study then predicts airflow patterns, temperatures, and areas of inefficiency throughout the space. CEG uses industry leading CFD software for all our modeling requirements.

Plan and implement changes confidently with a Digital Twin
Upon completion of our CFD study, CEG provides you with a Digital Twin of your space – the most accurate assessment of your data center’s current state and its readiness for future technologies. With our digital twin, you can make informed capacity plans while still maintaining your facility’s flexibility and speed.



Data Center Optimization Assessments
CEG’s 30+ years of being a trusted advisor to the data center industry gives us a unique and valued perspective on what’s required for facilities to succeed. Our assessments are your first step in achieving this. All of CEG’s assessments include an end-to-end review of your data center’s infrastructure, identifying any key areas of constraint or points of failure. We’ll also provide recommendations to address efficiencies-of-scale today and smart capacity planning tomorrow. CEG assessments can include the following:
Data Center Planning & Feasibility
Power infrastructure utilization and efficiency review
Thermal load analysis
Conditioned airflow and capacity evaluation
Physical room analysis and space optimization
Environmental monitoring assessment
Data center security and remote access & control
CFD modeling
Energy incentive review and recommendations