CEG

Turnkey Installation

TURNKEY INSTALLATION

Whether you’re just needing a single custom cabinet or you’re contemplating building an entirely new data center, CEG has the expertise to take a project of any size from conception to completion.

We have decades of experience in all facets of data center design – from critical power to precision cooling; from layout and capacity planning to monitoring and control systems. All of our engineers and technology specialist are factory trained and certified by our data center vendor partners. When providing turnkey service, our team will work diligently to understand your needs, and to recommend, procure, install and maintain the best solutions available to fit your requirements.

Assessment & Design

CEG can offer Assessment & Design services, as well as turnkey solutions for projects of any size and for any type of critical environment. An assessment will provide the end user with valuable advice about improving upon their facility, what equipment/hardware/software to purchase, and how components new and old will operate effectively together.

CEG will then guide you through all of the planning and execution phases while keeping timing and budget top-of-mind. You will have a single point of accountability and centralized coordination throughout the entire process.

Installation and Integration

When critical data center hardware components are purchased, they generally undergo a further series of steps before they can be deployed. First, our Factory Services Team will make sure your enclosures and integrated technologies are properly configured and fitted to your exact specifications prior to shipping. Upon arrival, this equipment will require uncrating, assembly, connections to power, mechanical, or network lines, configuration to existing equipment, and startup.

When providing onsite turnkey service, we can complement your current resources, or (with your approval) engage and manage reliable outside resources such as electrical, mechanical, and fire suppression contractors and engineering professionals for the design and installation of your data center physical infrastructure.

Examples of recently completed projects:

  • A major digital production company constructed a new data center to house large volumes of high resolution digital media along with other critical business applications.
  • A pharmaceutical testing firm used a landlord allowance and built a new data room for critical equipment in their suburban office building space.
  • A large construction products manufacturer moved a significant portion of its computing to a cloud environment, but needed to install a data center in its new corporate headquarters to house highly critical enterprise servers and data storage.
  • A traditional telecommunication provider had replaced all of its legacy central station phone switching equipment with a single rack, and decided to convert its facility into the first phase of a planned colocation site.

CEG helped these clients plan and procure critical physical infrastructure components for their new data centers including generators, UPS units, busway, cooling, racks and a multitude of other items.  We guided our clients through the process and managed various aspects of the design and construction.

CONTACT A DATA CENTER EXPERT:

Call: 800.257.5235
Email: cpartners@criticaleg.com